Facing government budget cuts of up to £40,000, Todwick Primary School needed a reliable, energy-efficient alternative to multiple kettles, which were proving slow and inefficient during staff’s short breaks. With four kettles running each breaktime, staff became frustrated with the limited downtime between lessons. The school also sought a low-maintenance solution that aligned with its sustainability and ESG goals, without disrupting daily operations.
View RangeSite Manager Mark Haywood, already familiar with Zip Water’s reliability, chose the WRAS-approved HydroBoil for its safety, efficiency, and durability – likening it to “an Audi: high quality and worth the investment.” Installed during the summer break, the HydroBoil now provides instant boiling water in the staffroom, reducing wait times and improving staff wellbeing. Mark also opted for three InLine heaters, as well as Zip Varipoint units in classrooms, and an AquaPoint, delivering efficient hot water across the school. Mark has full confidence in the system’s long-term performance and is already planning to install another HydroBoil unit in a future nursery expansion.
Enquire Today"“I was particularly drawn to the HydroBoil as a safe option for the school; the bright red lever is a great feature to help avoid scalding and ensure safety. Having used Zip products in a previous role, I knew I could rely on them for quality, eco-efficiency and performance, so it was an easy decision to call on Zip Water again.” "
Mark Haywood , Site Manager
Todwick Primary School
Talk to us about your next project, request a brochure or arrange a full product demo with one of our team.